Payment Type: | L/C,T/T,Paypal,Money Gram,Western Union |
---|---|
Incoterm: | FOB,CFR,CIF |
Min. Order: | 1000 Piece/Pieces |
Delivery Time: | 15 Days |
Model No.: CF750-KU
PP PVC Cooling Tower Filling For Cooling Tower
Cooling Tower Fill is one of the most important components for exchange of gas and water in cooling tower.
It is the major parts to improve the efficiency of cooling tower and make sure the economy and safe operation.
This kind of PVC cooling tower fill pack with the advanced technical, long lifetime, low resistance, light weight.
During the service, the fill can increase the water flow process. It is widely used in Square cooling tower.
Cooling Tower Filling Details:
Width:750mm
Length:400mm,600mm or as your request
Thickness:0.28mm-0.38mm
Sheet space:20mm
• Superior air/water management for high thermal performance
• Engineered [herringbone" surface (left) for even water distribution
• Honeycomb bonded edges on the air inlets and outlets
• Interlocking offsets space the sheets and form a pack that is strong enough to be stacked one on top of the other in towers with fill heights over 10 ft (3050 mm).
• Bottom-supported for durability and ease of installation
Packing:Cooling tower fill be packed by PE belt+wodden pallet or Woddern crate.
Cooling Tower Filling Specifications:
Name PVC PP Cooling Tower Filling Type Cross Flow Cooling Tower Packing Material Virgin PVC PP Usage For cooling tower to cooling the water Width 750mm Length Any length as your request Thickness 0.28mm-0.38mm Sheet Space 20mm
Application temperature: 75°C~35°C
Scope of application: square cross-flow cooling towers
FAQ:
1. What is the MOQ of PVC Cooling Tower Fill?
The MOQ is 1000 PCS.
2.What is the lead time?
The lead time is around 8 days to 12 days, based on your quantity.
3. Can you offer the free samples,how can we get ?
Yes,we can offer free samples for you testing the quality, you may pay for the freight.
4. How can we choose the shipping way?
For the small order,we suggest to ship by DHL,FEDEX,UPS door to door service. It will take 3-5days.
For the larger order,we suggest to ship by sea.If urgent,you can als choose air shipping.
Related Products:
Cooling Tower Parts:cooling tower fill,cooling tower spray nozzle,cooling tower air inlet louver,cooling tower drift eliminator.
Water Treatment:tube settler,water tank,bio ball filter media,fine bubble diffuser.
Product Categories : Cooling Tower Parts > Cooling Tower Fill